Preparing document for printing...
Print documents
Select the documents you want to print.
-
-
-
1. Capital Integration Project - Southwest Transitway (Stage 2) and Pembina Highway Underpass 1. Capital Integration Project - Southwest Transitway (Stage 2) and Pembina Highway Underpass
-
2. Expansion of Transit Vehicle Overhaul and Maintenance Facilities Capital Project 2. Expansion of Transit Vehicle Overhaul and Maintenance Facilities Capital Project
-
3. Results of the November 15, 2017 Advertisement of the Proposed Asphaltic Concrete Lane Pavement Local Improvement Projects 3. Results of the November 15, 2017 Advertisement of the Proposed Asphaltic Concrete Lane Pavement Local Improvement Projects
-
-
4. Waverley Street at CN Mainline (Rivers) Grade Separation 4. Waverley Street at CN Mainline (Rivers) Grade Separation
-
5. Delegation of Authority to Award Seven Public Works - General Capital Fund Contracts Exceeding $5,000,000 Including Multi-Year Contracts and PTIF Funded Contracts 5. Delegation of Authority to Award Seven Public Works - General Capital Fund Contracts Exceeding $5,000,000 Including Multi-Year Contracts and PTIF Funded Contracts
-
6. 2019 Industrial Street Location Approvals; First Charge Against 2019 Capital Budget - Regional and Local Streets Program; Delegation of Authority for the 2018/2019 Local Street Renewal Program - Industrial/Commercial Streets Projects 6. 2019 Industrial Street Location Approvals; First Charge Against 2019 Capital Budget - Regional and Local Streets Program; Delegation of Authority for the 2018/2019 Local Street Renewal Program - Industrial/Commercial Streets Projects
-
7. Transfer Funds to the Inkster Boulevard - Keewatin Street to Brookside Boulevard Project from the Public Works Non-Specified Account 7. Transfer Funds to the Inkster Boulevard - Keewatin Street to Brookside Boulevard Project from the Public Works Non-Specified Account
-
-
9. Active Transportation Network - Winter Maintenance Strategy 9. Active Transportation Network - Winter Maintenance Strategy
-
10. Reopening of Speers Road for Pedestrian and Cyclist Use 10. Reopening of Speers Road for Pedestrian and Cyclist Use
-
11. Traffic Study - Intersection of Regent Avenue West and Chrislind Street 11. Traffic Study - Intersection of Regent Avenue West and Chrislind Street
-
12. Crosswalk Request - Devonshire Drive West at Dawnville Drive 12. Crosswalk Request - Devonshire Drive West at Dawnville Drive
-
13. Proposed Median Opening Serving an Existing Commercial Development Located at 350 North Town Road 13. Proposed Median Opening Serving an Existing Commercial Development Located at 350 North Town Road
-
14. Traffic Study - Lee Boulevard and Waverley Street 14. Traffic Study - Lee Boulevard and Waverley Street
-
15. Traffic Study - 3-Way Stops on Blue Meadow Road 15. Traffic Study - 3-Way Stops on Blue Meadow Road
-
16. Traffic Study - Intersections of Pandora Avenue East at Day Street, Pandora Avenue East at Wayoata Street and Day Street at Kildare Avenue 16. Traffic Study - Intersections of Pandora Avenue East at Day Street, Pandora Avenue East at Wayoata Street and Day Street at Kildare Avenue
-
17. Traffic Study - Speed Limit on Waverley Street, from Bishop Grandin Boulevard to Sandusky Drive 17. Traffic Study - Speed Limit on Waverley Street, from Bishop Grandin Boulevard to Sandusky Drive
-
18. Traffic Study - Traffic Calming Solutions at the Intersection of McDermot Avenue and Furby Street 18. Traffic Study - Traffic Calming Solutions at the Intersection of McDermot Avenue and Furby Street
-
19. Speed Study - Perimeter Highway to the La Salle River Bridge 19. Speed Study - Perimeter Highway to the La Salle River Bridge
-
-
21. McDermot Avenue - Consideration of Back-In Angled Parking 21. McDermot Avenue - Consideration of Back-In Angled Parking
-
22. Bannatyne Avenue - Finalization of Back-In Angled Parking 22. Bannatyne Avenue - Finalization of Back-In Angled Parking
-
23. Installation of a 'No U-Turn' Sign on Henderson Highway at Valhalla Drive 23. Installation of a 'No U-Turn' Sign on Henderson Highway at Valhalla Drive
-
24. Removal of `Right Turn Only' Sign on Disraeli Highway at Henry Avenue 24. Removal of `Right Turn Only' Sign on Disraeli Highway at Henry Avenue
-
25. Establishment of a James Avenue Streetscaping and Road Renewal 2018 Capital Program Budget 25. Establishment of a James Avenue Streetscaping and Road Renewal 2018 Capital Program Budget
-
26. Authorization for Expenditures on the 2019 Capital Budget as a First Charge in Order to Satisfy a City Payment Obligation Related to the Tuxedo Yards Development Project 26. Authorization for Expenditures on the 2019 Capital Budget as a First Charge in Order to Satisfy a City Payment Obligation Related to the Tuxedo Yards Development Project
-
-