Preparing document for printing...
Print documents
Select the documents you want to print.
-
-
-
-
1. Request for Approval to Pilot Zero-Emission Buses for On-Request Transit Service 1. Request for Approval to Pilot Zero-Emission Buses for On-Request Transit Service
-
4. Approval of Contract Over-Expenditure for Construction Consultant / General Contractor (CC/GC) Services for the Decommissioning of the Arlington Street Bridge over CPKC Yards - Phase 2 Services for Part A Work – RFP No. 746-2025B – Contract 2 4. Approval of Contract Over-Expenditure for Construction Consultant / General Contractor (CC/GC) Services for the Decommissioning of the Arlington Street Bridge over CPKC Yards - Phase 2 Services for Part A Work – RFP No. 746-2025B – Contract 2
-
-
5. Contribution Agreement between the City of Winnipeg and His Majesty the King in Right of Canada for the ATF-3068-New Pathways in Northeast Winnipeg Connecting Communities Project 5. Contribution Agreement between the City of Winnipeg and His Majesty the King in Right of Canada for the ATF-3068-New Pathways in Northeast Winnipeg Connecting Communities Project
-
6. Winnipeg Wheelchair Accessible Vehicle (Winnipeg WAV) Pilot Project Update 6. Winnipeg Wheelchair Accessible Vehicle (Winnipeg WAV) Pilot Project Update
-
-
7. Transportation Master Plan – Goods Movement Study and FTE request 7. Transportation Master Plan – Goods Movement Study and FTE request
-
8. Transportation Master Plan – Curbside Management Strategy 8. Transportation Master Plan – Curbside Management Strategy
-
9. Updating the Transportation Standards Manual and Design of Streets 9. Updating the Transportation Standards Manual and Design of Streets
-
10. 2027 Pedestrian and Cycling Program (formerly “Updates on the Pedestrian and Cycling Strategies Document”) 10. 2027 Pedestrian and Cycling Program (formerly “Updates on the Pedestrian and Cycling Strategies Document”)
-
11. Access to a Vacant Property Located at 671 Sherbrook Street 11. Access to a Vacant Property Located at 671 Sherbrook Street
-
-
13. In-Service Road Safety Review for Osborne Street 13. In-Service Road Safety Review for Osborne Street
-
-
-
-
16. Turning Signal for Eastbound Portage Avenue at Mount Royal Road 16. Turning Signal for Eastbound Portage Avenue at Mount Royal Road
-
17. Traffic Signal on Grant Avenue at Oakdale Drive 17. Traffic Signal on Grant Avenue at Oakdale Drive
-
-
19. Turning Signal for Westbound Traffic on Ness Avenue at Ferry Road 19. Turning Signal for Westbound Traffic on Ness Avenue at Ferry Road
-
20. Conversion of the Traffic Signals at Elm Street and Grosvenor Avenue to a Pedestrian Crossing 20. Conversion of the Traffic Signals at Elm Street and Grosvenor Avenue to a Pedestrian Crossing
-
21. Intersection Safety Study at Bison Drive and Markham Road 21. Intersection Safety Study at Bison Drive and Markham Road
-
-
-
-
-
-
-
27. Construction of St. Mary’s Road Between Arden Avenue and Abinojii Mikanah 27. Construction of St. Mary’s Road Between Arden Avenue and Abinojii Mikanah
-
-
-